<p><img style="margin-right: 19px; margin-bottom: 10px; float: left;" alt="TopazDignity-on-slipway IMG 0218" src="http://www.marinelog.com/images/stories/2013APRIL/TopazDignity-on-slipway_IMG_0218.jpg" height="255" width="340" />APRIL 8, 2013 — Two 67 m, 80 ton bollard pull AHTS vessels built for Topaz Energy and Marine, a subsidiary of Oman-based Renaissance Services SAOG, the Topaz Dignity and Topaz Triumph, have MAN Diesel & Turbo medium-speed propulsion packages.</p>
<p><strong>Topaz Dignity on the slipway</strong></p>
<p>Built by Abu Dhabi-based shipbuilder Adyard, the vessels are ready for anchor handling tug supply services and the transportation of dry and liquid cargo to and from pipe-laying barges, drilling platforms and production platforms for offshore operations. The Topaz Dignity will operate on behalf of BP on a long-term-contract basis in the Caspian Sea – whilst Topaz Triumph may remain in the Middle East and be operated by Topaz Marine MENA. The state-of-the-art vessels are equipped with the latest technical equipment and are custom-built for Fi-Fi Class I and DP2 operations.</p>
<p><strong>Propulsion package</strong><br />The twin-screw propulsion package for each vessel consists of 8-cylinder, medium-speed MAN L27/38 engines of 2,720 kW each, horizontal offset reduction gearboxes with an CPP servo oil distribution unit, and a 1,500 kW shaft alternator PTO. The gearboxes drive approximately 18-m intermediate shafting, and 13 m propeller tailshafts in oil-lubricated stern tubes. The MAN Alpha CP Propellers are 2,800 mm diameter ducted, turning 198 r/min at MCR. The propeller thrust and pulling power is boosted by Alpha High Thrust nozzles, customized to hull integration with a length/diameter ratio (L/D) of 0.6. The Alphatronic 2000 Propulsion Control System is configured with twin control stations on both main bridge, aft bridge and in the engine control room – including interfaces to joystick and dynamic positioning systems.</p>
<p>After sea trials for the Topaz Triumph, Stewart Smith, Topaz Marine's Project Manager, expressed his satisfaction with the propulsion system and vessel performance in general: "Everything fulfilled our expectations. Compared to the estimated design speed of 13.5 knots for the vessel, we even achieved a radical increased top speed of 15 knots".</p>
<p>Additionally, a bollard pull test verified the vessels' pulling power specification by achieving a test result of 87 tons.</p>
<p><img style="vertical-align: middle;" alt="GA-Drawing Topaz-AHTS-X2" src="http://www.marinelog.com/images/stories/2013APRIL/GA-Drawing_Topaz-AHTS-X2.jpg" height="311" width="700" /></p>