<p><img style="margin-right: 10px; margin-bottom: 10px; float: left;" alt="HHI-TLP" src="http://www.marinelog.com/images/stories/2013MARCH/HHI-TLP.jpg" height="255" width="340" />MARCH 26, 2013 – Korea's Hyundai Heavy Industries (HHI), the world's largest shipbuilder has won orders worth $2 billion from Total E&amp;P Congo. They cover engineering, procurement, supply, construction, and commissioning of a $1.3 billion floating production unit (FPU) and a $700 million tension leg platform (TLP). The two offshore facilities are to be deployed in Moho Nord field, 80 km off the coast of the Republic of the Congo.</p> <p><strong>TLP</strong></p> <p>The 14,600-tonne vertically moored floating TLP will be used to extract oil and natural gas, and transport those to the floating production unit.</p> <p>The 62,000-tonne FPU, measuring 250 m in length, 44 m in width, and 18 m in depth, will process the received oil and gas, and send the products to onshore plants via subsea pipelines. The FPU has a production capacity of 100,000 barrels of oil and 2.5 million cu.m of natural gas per day.</p> <p>The TLP and FPU will be installed at the Moho Nord field in the first half of 2015 and 2016 respectively.</p> <p><strong>FPU</strong></p> <p><img style="float: left;" alt="HHI-FPU" src="http://www.marinelog.com/images/stories/2013MARCH/HHI-FPU.jpg" height="482" width="700" /></p>

News