<p><img style="margin-right: 10px; margin-bottom: 10px; float: left;" alt="WhiskeyIsland" src="http://www.marinelog.com/images/stories/2013AUGUST/WhiskeyIsland.jpg" height="255" width="340" />AUGUST 26, 2013 — Great Lakes Shipyard, Cleveland, OH, has been awarded a contract to fabricate a new floating breakwater for Cleveland's Whiskey Island Marina .</p>
<p>The shipyard will fabricate two 150 ft long steel cylindrical modules that will be bolted together and anchored in the lake bottom in front of the marina. The 10-foot diameter breakwater is used for wake attenuation to protect the boats and docks in the marina basin from heavy weather and is ballasted to the 6.5 ft waterline.</p>
<p>The project is to be completed by mid-November.</p>
<p>The shipyard built a similar floating breakwater for Perry's Landing Marina, Erie, PA in 2010. That project involved the assembly of five 40 ft x 5 ft wide x 8 ft sections, ballasted to the 4.5 ft waterline.</p>